Public Works

17½ Street NW Reconstruction Project
All-Way Stop Signs Coming to 14th Ave. SW and Peace Garden Dr. SW
City of Rochester Construction Projects Maps and Links
Dental Amalgam Program
Free Sand - Winter
Get Amped: The Basics of Electrifying Your Home
Mill and Overlay of Various Streets to Begin--April through August 2025
Right-of-Way Permits
Right-of-Way Record Drawings / "As-Built" Requests
RV Dump
Sanitary Sewer System & Maintenance
Sidewalks and Paths
Signs Not Permitted in the Right-of-Way
Snow and Ice Control
Snow Plows
Wastewater Management: Rates, Services and Education

Construction Site Erosion & Sediment Control

City of Rochester Construction Projects Maps and Links
Erosion & Sediment Control Practices

Environmental Services

Biosolids Programs
City of Rochester Construction Projects Maps and Links
Drinking Water Protection
Energy Conservation
Fats, Oils, and Grease (FOG) Program
Fertilizer Use on Private Property
Pretreatment Program
Stormwater Management
Wastewater Management

Illegal Dumping in Waterways

Illicit Discharge - Storm Sewer System

Infrastructure Maintenance

Curb & Gutter Replacement
Seasonal Load Restrictions
Street Maintenance
Traffic Control & Operation

Obstructions on Public Sidewalks

City of Rochester Construction Projects Maps and Links

Potholes

Potholes

Right-of-Way Permits

Do I Need a Permit for a Dumpster in my Driveway?
Obstruction Permits

Right-of-Way/Construction Inquiry

City of Rochester Construction Projects Maps and Links

Sidewalk Tripping Hazards

Sidewalk Improvement Districts Map
Sidewalk Snow Removal

Traffic Concerns

City of Rochester Construction Projects Maps and Links
Seasonal Parking/Winter Rules

Traffic Sign/Pavement Marking Concerns

Impaired Child Sign

Water Reclamation Plant Tour Request

Water Reclamation Plant

Can't find what you're looking for? Create a request for service