Homeowner's Guide to Solar System Permits
Category:
Building & Trade Permits/Plan Review
Electrical permits are required for the installation of PV systems, whether they are attached to the structure or free standing. A building permit may be required, dependent upon a flush-mounted, non-flush-mounted or free-standing system. For more information on solar projects, visit: Solar - Photovoltaic (PV) Systems | Rochester, MN.
Updated 1/22/2026 2:19 PM