Knowledge Base

Marion Road Duct Bank: Soldiers Field

Category: City Projects

The substation addition will allow RPU to serve load growth in Southern Rochester and Downtown Rochester. The duct bank phase of the project will provide pathways for electric distribution circuits that can deliver electrical energy along its route. As part of this project other City infrastructure will be installed or upgraded along the route to limit near term future disturbances.

For more information, visit:

Marion Road Substation and Duct Bank Installation Project

 

Project Contact:

Steven Cook, Supervisor of Engineering

scook@rpu.org

Updated 9/30/2025 9:51 AM
Was this page helpful? Yes No
Thanks for your feedback!