Marion Road Duct Bank: Slatterly Park - East
Category:
City Projects
The substation addition will allow RPU to serve load growth in Southern Rochester and Downtown Rochester. The duct bank phase of the project will provide pathways for electric distribution circuits that can deliver electrical energy along its route. As part of this project other City infrastructure will be installed or upgraded along the route to limit near term future disturbances.
For more information, visit:
Marion Road Substation and Duct Bank Installation Project
Project Contact:
Steven Cook, Supervisor of Engineering
Updated 9/30/2025 9:30 AM